How Much Concrete for a 30×30 Slab?

A 30×30 ft slab (900 ft²) at 4 in thick needs 11.11 cubic yards of concrete, or about 12.22 yd³ with 10% waste. In bags that is 550 bags of 80 lb mix. Change the thickness below to see other options.

  • Free
  • No sign-up
  • Math shown
  • Sources listed

Your measurements

Quick sizes

How many identical pieces

%

5–10% is the usual advice. Use more when the subgrade is uneven, forms may flex or spillage is likely.

Advanced assumptions

Yields come from the bag label or data sheet. Check yours: other products (high-strength, lightweight) differ.

Order about12.22 yd³9.34 m³ · 330.00 ft³ · includes 10% waste

Above 2 yd³ ready-mix is usually the better choice. Hand-mixing 550 bags is a long day. Small truck orders often carry a short-load fee, so ask your plant.

Example for the numbers in the form. Change any value to calculate your own.

Volume

Net volume
11.111 yd³
Net volume
300.00 ft³
Net volume
8.495 m³
Order (with waste)
12.22 yd³

Bagged mix (80/60/50/40 lb)

80 lb bags
550
60 lb bags
734
50 lb bags
880
40 lb bags
1,100

Weight of the order

Pounds
49,500 lb
US tons
24.75
Kilograms
22,453 kg
Density used
150 lb/ft³

Wheelbarrow loads

3 ft³ barrow
110 loads
6 ft³ barrow
55 loads

Material cost (estimate)

Ready-mix
$1,528 – $2,583
Bagged (80 lb)
$3,025 – $4,400

Ranges, last verified 2026-10-04. Excludes labor, forms and finishing.

Next: plan the rest of the pour

These open with your measurements already filled in.

By the Editorial team · How we calculate · Updated Oct 4, 2026

Prices last verified: 2026-10-04. How we source prices.

Show the math
  1. Convert to feet (inches ÷ 12, centimeters ÷ 30.48): Length 30 ft; Width 30 ft; Thickness 4 in = 0.3333 ft
  2. Volume = 30 × 30 × 0.3333 × 1 = 300 ft³
  3. Net volume = 300 ft³ ÷ 27 = 11.1111 yd³ (× 0.0283168 = 8.4951 m³)
  4. Order quantity = 11.1111 yd³ × (1 + 10%) = 12.2222 yd³ = 330 ft³
  5. 80 lb bags = 330 ft³ ÷ 0.6 ft³ per bag = 550 → 550 bags (always round up)
  6. Weight = 330 ft³ × 150 lb/ft³ = 49,500 lb

What this slab is used for

Thirty by thirty feet (900 ft²) is a large detached garage for three vehicles, a shop, or a small barn. It is also a typical size for a basement or a farm outbuilding. At this scale, the slab is a structural element of the building, not a patio.

A 4 in slab is the minimum. Five or six inches, with steel and a thickened perimeter or footing, is common for vehicles and equipment. Large floors often get a saw-cut joint grid with panels of about 10 to 12 ft, and need an engineer’s plan if they carry a building.

30 by 30 ft slab30 ft30 ftThickness (T)
The 30×30 ft footprint is 900 ft² (83.6 m²).

Concrete for a 30×30 ft slab at each thickness

The volume is 12.22 yd³ at 4 in, 15.28 yd³ at 5 in and 18.33 yd³ at 6 in, or 2 to 2 truckloads. The slab weighs 24.75 tons. You need a pour plan: trucks spaced so that each arrives as the last is finishing, enough people for placing, screeding and floating, and a plan to saw-cut the joints in time.

30×30 ft slab, 10% waste
ThicknessNet yd³Order yd³Order m³80 lb bags60 lb bagsWeight
3 in8.339.177.0141355037,125 lb
4 in11.1112.229.3455073449,500 lb
5 in13.8915.2811.6868891761,875 lb
6 in16.6718.3314.02825110074,250 lb

The formula is 30 × 30 × thickness ÷ 12 ÷ 27 for the net volume. The order adds 10% for waste and rounds the bag counts up. Use the calculator above for another thickness or waste allowance.

Bags or ready-mix for 30×30 ft?

Bags: 550 bags of 80 lb mix at 4 in, a total of 44,000 lb of dry product. Ready-mix: 12.22 yd³, material about $1,528–$2,583 at the published range, last verified 2026-10-04, before delivery and short-load fees. Bagged concrete for this slab costs about $3,025–$4,400. Because the order is above two cubic yards, a truck is usually the practical choice, and at 6 in you may need 2 loads. See bagged vs ready-mix.

What to watch for

  • Not booking enough trucks, or booking them to arrive together.
  • Having no plan to reach the middle of a 30 ft span.
  • Running out of finishing help as the surface begins to set.
  • Not reading the weather. Heat, wind or rain can ruin a pour that takes hours.

Layout and joints

Many owners hire a concrete contractor for a floor this size; the calculator is still useful for checking the quote.

For a 4 in slab, joint spacing of 8 to 12 ft is the usual range, with a 15 ft maximum for any thickness. Read the control joints guide for depth and timing.

Example joint layout for a 30×30 ft slab10 ft30 × 30 ft slab, joints every 10 ft
One possible joint layout for a 30×30 ft slab. Your plan may differ.

Before you order

  1. Measure the forms, not the excavation, and check the thickness in several places.
  2. Add the volume of any thickened edge, apron or step separately.
  3. Plan the base: use the gravel base calculator to estimate stone for 900 ft².
  4. If the design calls for steel, estimate it with the rebar calculator.
  5. Put the quantity on the Pour List to combine it with footings and steps.

Frequently asked questions

How many yards of concrete for a 30×30 slab?

11.11 yd³ net at 4 in, 12.22 yd³ with 10% waste.

How many bags of concrete for a 30×30 slab?

550 bags of 80 lb mix or 734 bags of 60 lb mix at 4 in with 10% waste.

How much does a 30×30 slab weigh?

About 49,500 lb (24.75 US tons) at 4 in with 10% waste, using 150 lb/ft³.

How many yards for a 30×30 slab at 6 in?

18.33 yd³ with 10% waste.

How much does a 30×30 concrete slab cost in materials?

About $1,528–$2,583 for ready-mix concrete at 4 in, before delivery fees, based on the ranges on the cost page (verified 2026-10-04).

Sources

Estimate only. Results depend on the numbers you enter, ground conditions and your supplier. For structural work consult a licensed engineer and follow local codes. Brand names such as Quikrete and Sakrete are used only to cite published product data. This site is not affiliated with any brand.

Order about12.22 yd³

↑↓ to move Enter to open Esc to close

Share this page

On this page

My Pour List